Keep your project on budget.

An independent expert on your side of every new build, remodel, and rescue.

Book a 20-minute call

What you're actually buying

Four promises, and none of them move.

I'm not the builder, the architect, or the lender. I'm the one person on your project whose only job is your side of the table.

Flat fee.

I'm paid the same whether your budget grows or not.

No referral fees.

Builders, subcontractors, suppliers, and designers often pay referral fees to whoever sends them work. I never accept them, so my advice is never for sale.

You decide everything.

I advise. Every decision stays yours.

Plain monthly reporting.

One clear report a month. No surprises.

Cost estimator

What could an overrun cost you?

Pick your project type and size to see an estimate of what overruns and delays could cost.

Your project

What kind of project?

Construction budget$5.0M
$1M$20M

The build itself, before land and design fees.

What it could cost you

The difference, in dollars

Estimated at risk

$0

Overruns: $750,000

New builds typically run about 15% over, driven by low allowances (placeholder budgets for things you haven't picked yet), gaps in the plans, and change orders (price changes for work added or changed after you sign) that nobody checks.

Delays: $120,000

About 4 extra months of loan interest, rent, and insurance, at roughly $30,000 a month.

Potential savings with a rep

$0

Estimated fee$135,000

That's about 2.6 times the estimated fee.

Overrun without a rep$870,000
Overrun with a rep plus estimated fee$483,000
Savings kept: $348,000Estimated fee: $135,000

Estimates only, for illustration. Actual costs, fees, and savings depend on your project, contract, and builder. Not a quote or a guarantee of savings.

Featured project

A stripped-down house, rebuilt right, and more than doubled in value.

All projects
Caminito Northland, after
Caminito Northland, before
BeforeAfter

Drag the handle, or use the arrow keys, to compare before and after.

La Jolla

Caminito Northland

A stalled, poorly built house on a La Jolla hillside, bought at $1.4M and rebuilt into a home appraised above $5.5M.

Purchased
$1.4M
Renovation
$1.5M
Size
3,900 to 6,000 sq ft
Appraised
$5.5M+
Read the full project

How it works

Three steps, and you're never guessing again.

01

A 20-minute call

Tell me where you are: buying land, in design, bidding, or already building. I'll tell you straight away whether I can help and what it would cost.

02

Builder Contract Review or Pre-Construction Review

I read your bid, the allowances behind it (the placeholder budgets for things you haven't picked yet), your contract, and your drawings, then put the business risks in writing, in plain language, before you sign anything.

03

Advisory through completion

Every change order (a price change for work added or changed after you sign) and every builder invoice gets checked. You get a site walk and one clear report a month until the final payment is released.

Book a 20-minute call

No charge, no obligation, and no sales pitch.

Who's who on your build

Everyone on your build is a professional. Only one works for you.

Your architect designs the home. Your builder puts it up. Your lender protects the bank. Your inspector checks code. All of them are good at their jobs, and none of them are paid to watch your budget.

See who works for whom
  • Architect: designs, and is often paid a percentage of construction cost.
  • Builder: builds, and earns on change orders.
  • Lender: protects the collateral, not your bottom line.
  • Inspector: checks safety and code, not cost.
  • The OWNER'S Rep: checks the numbers, for a flat fee.

Free guide

Why Coastal Custom Homes Go Over Budget

Six places money leaks out of a San Diego custom build, in plain language, with the questions worth asking before you sign with a builder. It takes ten minutes to read and it's the same thing I walk every client through on our first call.

Why Coastal Custom Homes Go Over Budget

The six places budgets quietly go wrong on a San Diego coastal build, and what to check before you sign with a builder. Free, and no obligation.

I'll send the guide and the occasional note about building on the coast. Unsubscribe any time.

Start here

Tell me about your build.

You'll hear back from me within one business day. If a 20-minute call is easier, the form takes you straight there.

Your calculator numbers came with you.

Your information stays with me. No lists, no sharing, no follow-up campaigns.